Paver base depth: how much gravel and sand under pavers

Under a paver walkway or patio, lay at least 4 in of compacted crushed-stone base; under a driveway, at least 6 in. Add 1 in of bedding sand on top. Those are the Concrete Masonry & Hardscapes Association minimums for firm, well-drained soil without frost; add half the minimum again for each of those the site lacks. With 2-3/8 in pavers, a patio dig starts at 7-3/8 in deep.

Base depth for walkways, patios and driveways

The base carries the load; the pavers and sand only spread it. The Concrete Masonry & Hardscapes Association (CMHA, formerly the Interlocking Concrete Pavement Institute) sets the minimum compacted base at 4 in for walkways, patios and other foot traffic and 6 in for residential driveways. Those minimums assume ideal conditions: a strong subgrade, good drainage and no freezing. For each one the site lacks, CMHA says to add 50% of the minimum.

Minimum compacted base by CMHA guidance. Dig depth adds 1 in of bedding sand and a 2-3/8 in paver, measured from the finished surface.
SiteBase depthDig depth
Walkway or patio
Firm, well-drained soil, no frost4 in7-3/8 in
One of: weak soil, poor drainage or freezing6 in9-3/8 in
Two of the three8 in11-3/8 in
All three10 in13-3/8 in
Residential driveway
Firm, well-drained soil, no frost6 in9-3/8 in
One of: weak soil, poor drainage or freezing9 in12-3/8 in
Two of the three12 in15-3/8 in
All three15 in18-3/8 in

A driveway on weak, wet, frost-prone clay works out to 15 in of base. CMHA calls that a rough estimate and sends streets and heavy-duty pavements to a civil engineer; on a site that poor, a local engineer's opinion is worth getting for a driveway too. Where the paver maker's installation guide asks for more than this table, follow the paver maker.

Bedding sand: one inch, screeded, not compacted

The sand is a setting bed, not part of the structure. CMHA's construction tech note calls for an uncompacted, nominal 1 in layer of coarse, washed sand meeting ASTM C33 (concrete sand), screeded flat over the finished base. Do not use it to fix low spots in the base; a thick patch of sand settles more than the sand around it and shows as a dip. Masonry sand, limestone screenings and stone dust are on CMHA's do-not-use list for bedding.

The base below should already have the final slope. The sand is laid at an even thickness, so the pavers follow whatever the base does.

Tons of base and sand per 100 square feet

Each row is 100 ft² (a 10 × 10 ft area) at one of the base depths above. The base is ordered 20% over its finished volume because loose crushed stone packs down under the compactor. Crushed stone is figured at 2,800 lb per cubic yard, as the paver calculator does; crusher run with fines is heavier, at 2,900 lb.

Per 100 ft². Base volume includes 20% for compaction; bedding sand is 1 in of concrete sand at 2,700 lb/yd³, no allowance. Weights are typical; your supplier's scale governs.
Base depthBase to order (yd³)Crushed stone (tons)Crusher run (tons)Bedding sand (tons)
4 in1.482.072.150.42
6 in2.223.113.220.42
8 in2.964.154.300.42
9 in3.334.674.830.42
10 in3.705.195.370.42
12 in4.446.226.440.42
15 in5.567.788.060.42

Scale by your area. A 12 × 16 ft patio is 192 ft²: on 4 in of base it takes 3.98 tons of crushed stone and 0.80 tons of sand. On frost-prone clay, two conditions short, the base goes to 8 in and the stone to 7.96 tons. Run the base a little past the paver edge so the edge restraint sits on compacted stone, and add that strip to the base order.

Compacting the base in lifts

A plate compactor can only pack so much stone at once, so the base goes down in layers called lifts, each compacted before the next is spread. CMHA's tech note specifies lifts of 4 to 6 in with a 7,000 lbf reversible plate compactor, compacted to at least 98% of standard Proctor density, and CMHA calls any plate under 5,000 lbf too small. With a lighter rental plate, spread thinner lifts; 2 to 3 in is common practice.

  • Compact the soil at the bottom of the dig before any stone goes in. Soft spots get dug out and filled with base.
  • Keep the base slightly damp while you compact it; bone-dry stone with fines is hard to pack.
  • Make several passes in overlapping, crossing directions on each lift, and check depth with a string line after compaction, not before.
  • A 6 in driveway base is 1 or 2 lifts depending on the plate; a 15 in base is 3 to 5.

Geotextile on clay and wet soils

On clay, moist silty soil or ground that stays saturated part of the year, CMHA allows a geotextile between the soil and the base. It keeps the fine soil from pumping up into the stone, which would weaken the base over time. Lay it flat with no wrinkles across the whole bottom of the dig and turn it up the sides. On those soils the extra base depth from the first table still applies; the fabric is a separator, not a substitute for depth.

Sources

Frequently asked questions

How deep do I dig for a paver patio?

At least the base, the sand and the paver together: 4 + 1 + 2-3/8 in = 7-3/8 in on firm, well-drained soil, measured below the finished surface. On clay or where the ground freezes, the base and the dig get deeper.

Can I use 2 inches of base for a walkway?

Not by CMHA guidance, which sets 4 in of compacted base as the minimum even for foot traffic on good soil. A thin base lets pavers settle and rock.

Can I use stone dust instead of sand under pavers?

No. CMHA says limestone screenings and stone dust should not be used for bedding, nor masonry sand. Use coarse, washed concrete sand meeting ASTM C33.

Can I use pea gravel as paver base?

No. Rounded stone such as pea gravel or river rock rolls instead of locking together. Use a dense-graded crushed base with fines, sold as road base, crusher run or paver base.

Do I need landscape fabric under paver base?

Not on firm, well-drained soil. On clay, silty soil or ground that stays wet part of the year, a geotextile under the base keeps the stone from pushing down into the soil.