How the service load is calculated
The optional method in NEC 220.82 lumps almost everything in the house into one general load, discounts it, and then adds heating or cooling on top.
general load = 3 VA × floor area + 1,500 VA × small-appliance circuits + 1,500 VA × laundry circuits + every appliance nameplate
Appliances are the ones fastened in place or on their own circuit: range, wall oven, cooktop, dryer, water heater, dishwasher, disposal, built-in microwave, EV charger, well pump, hot tub and the like. An EV charger counts at 7,200 VA or its nameplate, whichever is larger (220.57).
demand load = first 10,000 VA at 100% + the rest at 40%
Then pick the heating or cooling figure from 220.82(C), whichever is largest:
gas heat: air conditioner at 100%
electric furnace, or fewer than four separately controlled heaters: the larger of the air conditioner or 65% of the heat
baseboard or room heaters on four or more thermostats: the larger of the air conditioner or 40% of the heat
heat pump: compressor at 100% + 65% of the backup strips
The heat-pump line is conservative: 220.82(C) lets you leave the compressor out of the heating figure when its controls stop it running at the same time as the backup strips.
total load = demand load + heating or cooling
amps = total load ÷ 240 V
minimum service = next standard rating at or above the amps (240.6(A)), never under 100 A
The common panel size is the first of 100, 125, 150, 200, 225, 400 A that covers the minimum.
Worked example: 2,000 ft² house
The calculator opens on a 2,000 ft² house with gas heat, a 12,000 VA range, 5,000 VA dryer, 4,500 VA water heater, 1,200 VA dishwasher, 900 VA disposal and a 4,800 VA air conditioner (about 3 tons).
- Lighting: 3 × 2,000 = 6,000 VA. Kitchen: 2 × 1,500 = 3,000 VA. Laundry: 1 × 1,500 = 1,500 VA.
- Appliances: 12,000 + 5,000 + 4,500 + 1,200 + 900 = 23,600 VA.
- General load: 6,000 + 3,000 + 1,500 + 23,600 = 34,100 VA.
- Demand: 10,000 + 40% × 24,100 = 19,640 VA. The other 60% of the remainder, 14,460 VA, is not counted.
- Cooling: gas heat, so the air conditioner counts at 100%, 4,800 VA.
- Total: 19,640 + 4,800 = 24,440 VA ÷ 240 V = 101.8 A.
- The next standard rating above 101.8 A is 110 A, so the minimum service is 110 A and the common panel is 125 A.
Add a 7,200 VA EV charger and the same house comes to 113.8 A (125 A minimum). Swap the gas furnace for a 15 kW electric one as well and it reaches 134.5 A, a 150 A panel. A 3,500 ft² all-electric house with a 9,600 VA charger lands at 173.1 A, a 200 A panel.
Reading nameplates
- Use the nameplate rating, not a typical wattage. Ranges and cooktops list kW: 12 kW is 12,000 VA.
- For a tank water heater with two elements that cannot run together, use the rating on the label, usually one element.
- Enter the air conditioner or heat pump from the condensing unit’s nameplate. If you only know the tonnage, about 1,600 VA per ton is a rough starting figure; replace it with the nameplate before you file.
- Heat-pump strips are listed in kW on the air handler. Enter the full strip rating; the calculator applies the 65%.
- Floor area is measured from the outside of the walls on every floor. Leave out the garage, open porches and unfinished spaces that can’t be finished later.
- Kitchens need at least 2 small-appliance circuits (210.11(C)(1)); count every 20 A countertop and dining circuit you actually have.
Code notes and when to call an electrician
The optional method is only for one dwelling unit with a service of 100 A or more (220.82(A)). Adding a load to an existing house is calculated under 220.83, and apartment buildings under 220.84. The standard method in Article 220 Part III uses different demand factors and gives a different number. Your inspector may ask which method you used, so print the result rows with the permit.
The service size also sets the service conductors, grounding electrode conductor and meter base, and the utility has its own requirements. Have a licensed electrician confirm the load and pull the permit before any service upgrade, and treat this calculation as the starting point for that conversation.
Sources
- NFPA 70, National Electrical Code, 2023 edition, 220.82 (dwelling unit optional calculation): (A) scope, (B) general loads and the 10 kVA / 40% demand, (C) heating and air-conditioning load
- NFPA 70, 2023, 220.57 (electric vehicle supply equipment load: 7,200 VA or nameplate, whichever is larger) and 220.5(C) (floor area from outside dimensions)
- NFPA 70, 2023, 210.11(C)(1) (at least two small-appliance branch circuits)
- NFPA 70, 2023, 230.79(C) (100 A minimum service disconnect for a one-family dwelling) and 240.6(A) (standard ampere ratings)